List of Para (Order by Audited Year & Para)
  View Detailed Audit Report
Department :Public Works (PWD)
Sub department:EE (C ), (West) Road-1, PWD (M-111), R.R Lines, Dhaula Kuan, New Delhi (1457/12)
S No. Start Year End Year Para No. Sub Para Subject Status* Outstanding Amount (in Rs.)
1 2005 2006 3 Record of Vehical No. DL6C-J-0066 C 0
2 2005 2006 4 Verification of Record in r/o Payment Amounting to Rs. 51,450 C 0
3 2005 2006 5 Verification of record "Improvement of drainage system of road No.89 C 0
4 2005 2006 6 Verification of record in R/o wide of road No. 36 from jail road C 0
5 2005 2006 7 Irregularities in the work Corridor Improvement of Ring Road Ph-III C 0
6 2005 2006 8 Widening of road No. 36 from jail road crossing to Mayapuri Crossing C 0
7 2005 2006 9 Contingent bills C 0
8 2005 2006 10 Verification of Record "Resurfacing/macro surface of Road No. 11 and Domestic Airport road. C 0
9 2005 2006 11 Income Tax C 0
10 2007 2008 2 A/R & M/o various under PWD Division M-111 during 2007-08 (SH: Patch repair works on various roads under sub division: M-111) C 0
11 2007 2008 3 Confirmation regarding utilization / unutilization of cheque books / prior to reconstruction of division. C 0
12 2007 2008 4 Improvement of Delhi Gurgaon Boarder at Old D.G. Road (SH: Cement concrete with vacume dewatering system) C 0
13 2007 2008 5 Blockade of funds amounting to Rs. 42.84 Lacs due to non availability of site C 0
14 2007 2008 8 Restoration charges / Departmental charges - 2007-08 C 0
15 2007 2008 9 Construction of service road i.e. drainage on link road from NH-8 junction to Samalkha Road C 0
16 2007 2008 12 Petrol consumption in Govt. Vehicles C 0
17 2008 2010 1 Performance of the Division C 0
18 2008 2010 2 Loss of interest of Rs. 6.71 Lakh C 0
19 2008 2010 3 Violation of delegation of powers C 0
20 2008 2010 4 Splitting up the work C 0
21 2008 2010 5 Revised Technical Sanction C 0
22 2008 2010 6 Discrepancies in awarding the work for watch and ward of sub-division office, Kapashera C 4115
23 2008 2010 7 Wasteful expenditure on advertisement (Agreement No. 13/09-10) C 0
24 2013 2016 1 Non levy of compensation of Rs. 9,76,956/- O 976956
25 2016 2019 1 Office expenditure charged to works O 0
26 2016 2019 3 Unfruitful expenditure of Rs. 11054425/- lakhs due to stoppage of works O 0
27 2016 2019 4 Foreclosure of work due to non availability of clear site O 0
28 2019 2023 1 Recovery on account of Cycle Allowance O 170820
29 2019 2023 2 Irregular contingent expenditure made by the Division and charged to works O 0
30 2019 2023 3 Non completion of works O 0
31 2019 2023 4 Public Works Deposit O 0
32 2019 2023 5 Time barred cheques amounting to Rs. 5074074/- O 0
33 2019 2023 6 Non forfeiture of Performance Guarantee O 85359
34 2019 2023 7 Avoidable expenditure of Rs. 48259/- due to injudicious assessment of sanctioned load of Electricity O 0
35 2019 2023 8 Non recovery of Rs. 1.35 lakh from the contractor for failure to provide an Engineer at site O 135000
36 2019 2023 9 Wasteful expenditure amounting to Rs. 3689915/- due to foreclosure of works O 0
37 2019 2023 10 Infructuous expenditure of Rs. 21287253/- to the contractor for not completed the work O 0
38 2019 2023 11 Non production of Record O 0
* NOTE:
'O'- Outstanding Paras.
'R' -Reply submitted by the Department/Units.
'C'- Comment by the Directorate of Audit on reply submitted.